1. Name: Luh-Maan Chang
3. Previous Academic Ranks and Dates:
|
[Top] [Bottom] [Resume Summary] |
| Year |
Semester |
No. |
Title |
Credit |
No. of Enroll. |
2003 |
Fall |
CE 521 |
Construction Business Management |
(3) |
31 |
2003 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
51 |
| 2003 |
Spr. |
CE 597C |
High-Tech Construction |
(3) |
21 |
| 2003 |
Spr. |
CE 597 |
Special Topic |
(3) |
1 |
| 2002 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
50 |
| 2002 |
Spr. |
CE 620 |
Construction Productivity Improvement |
(3) |
14 |
| 2001 |
Fall |
CE 521 |
Construction Business Management |
(3) |
64 |
| 2001 |
Fall |
CE 321 |
Construction Planning & Scheduling |
(3) |
41 |
| 2000 |
Fall |
CE 394 |
Engineering Economics, History, Ethics and Case Studies (responsible for 6 weeks of Engineering Economics) |
(3) |
87 |
| 2000 |
Fall |
CE 521 |
Construction Business Management |
(3) |
23 |
| 2000 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
36 |
| 2000 |
Spr. |
CE 620 |
Construction Productivity Improvement |
(3) |
11 |
| 1999 |
Fall |
CE 321 |
Construction Planning & Scheduling |
(3) |
49 |
| 1999 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
46 |
| 1999 |
Spr. |
CE 620 |
Construction Productivity |
(3) |
14 |
| 1999 |
Spr. |
CE 497 |
Special Topic |
(3) |
3 |
| 1999 |
Spr. |
CE 597 |
Special Topic |
(3) |
1 |
| 1998 |
Fall |
CE 597C |
Construction Business Management |
(3) |
27 |
| 1998 |
Fall |
CE 321 |
Construction Planning & Scheduling |
(3) |
29 |
| 1998 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
52 |
| 1998 |
Spr. |
CE 597C |
Construction Business Management |
(3) |
20 |
| 1997 |
Fall |
CE 321 |
Construction Planning & Scheduling |
(3) |
44 |
| 1997 |
Fall |
CE 620 |
Construction Productivity & Improvement |
(3) |
7 |
| 1997 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
25 |
| 1997 |
Spr. |
CE 333 |
Engineering Materials |
(3) |
58 |
| 1996 |
Fall |
CE 321 |
Construction Planning & Scheduling |
(3) |
54 |
| 1996 |
Fall |
CE 620 |
Construction Productivity Improvement |
(3) |
12 |
| 1996 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
50 |
| 1996 |
Spr. |
CE 333 |
Engineering Materials |
(3) |
43 |
| 1996 |
Spr. |
CE 394 |
Engineering Economics History, Ethics, and Case Studies (responsible for 3 weeks case studies) |
(3) |
123 |
| 1995 |
Fall |
CE 321 |
Construction Planning & Scheduling |
(3) |
48 |
| 1995 |
Fall |
CE 620 |
Construction Productivity Improvement |
(3) |
7 |
| 1995 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
63 |
| 1995 |
Spr. |
CE 333 |
Engineering Materials |
(3) |
15 |
| 1995 |
Spr. |
CE 394 |
Engineering Economics History, Ethics, and Case Studies (responsible for 2 weeks case studies) |
(3) |
139 |
| 1994 |
Fall |
CE 620 |
Construction Productivity Improvement |
(3) |
23 |
| 1994 |
Fall |
CE 321 |
Construction Planning & Scheduling |
(4) |
43 |
| 1994 |
Fall |
CE 394 |
Engineering Economics History, Ethics, and Case Studies (responsible for 2 weeks case studies) |
(3) |
140 |
| 1993 |
Spr. |
|
Construction Project Control Systems (at National Taiwan University) |
(3) |
9 |
| 1993 |
Spr. |
CE 621 |
Construction Company Management |
(3) |
21 |
| 1993 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
40 |
| 1992 |
Fall |
CE 220 |
Construction Management |
(3) |
66 |
| 1992 |
Fall |
CE 620 |
Construction Productivity Improvement |
(3) |
19 |
| 1992 |
Fall |
CE 321 |
Construction Planning & Scheduling |
(3) |
39 |
| 1992 |
Spr. |
CE 220 |
Construction Management |
(3) |
41 |
| 1992 |
Spr. |
CE 621 |
Construction Company Management |
(3) |
16 |
| 1992 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
42 |
| 1991 |
Fall |
CE 520 |
Construction Project Control Systems |
(3) |
18 |
| 1991 |
Fall |
CE 321 |
Construction Planning & Scheduling |
(3) |
34 |
| 1991 |
Spr. |
CE 620 |
Construction Productivity Improvement |
(3) |
16 |
| 1991 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
38 |
| 1990 |
Fall |
CE 520 |
Construction Project Control Systems |
(3) |
22 |
| 1990 |
Fall |
CE 321 |
Construction Planning & Scheduling |
(3) |
42 |
| 1990 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
54 |
| 1990 |
Spr. |
CE 620 |
Construction Productivity Improvement |
(3) |
16 |
| 1989 |
Fall |
CE 321 |
Construction Planning & Scheduling |
(3) |
49 |
| 1989 |
Fall |
CE 520 |
Construction Project Control Systems |
(3) |
17 |
| 1989 |
Spr. |
CE 321 |
Construction Planning & Scheduling |
(3) |
46 |
| 1989 |
Spr. |
CE 333 |
Engineering Material |
(3) |
16 |
| 1989 |
Fall |
CE 321 |
Construction Planning & Scheduling |
(3) |
50 |
| 1989 |
Fall |
CE 620 |
Construction Productivity Improvement |
(3) |
11 |
| 1988 |
Spr. |
CE 333 |
Engineering Material |
(3) |
40 |
| 1988 |
Spr. |
CE 426 |
Construction Project Management |
(3) |
18 |
| 1987 |
Fall |
CE 221 |
Construction Plans & Estimates |
(3) |
41 |
| 1987 |
Fall |
CE 697 |
Project Management and Construction Productivity |
(3) |
16 |
| 1987 |
Spr. |
CE 221 |
Construction Plans & Estimates |
(3) |
44 |
| 1987 |
Spr. |
CE 333 |
Engineering Materials |
(3) |
35 |
| 1987 |
Spr. |
CE 294 |
Civil Engineering History |
(3) |
28 |
| 1986 |
Fall |
CE 697 |
Project Management and Construction Productivity |
(3) |
17 |
| 1986 |
Fall |
CE 422 |
Cost Engineering |
(3) |
66 |
| 1986 |
Spr. |
CE 422 |
Cost Engineering |
(3) |
29 |
|
[Top] [Bottom] [Resume Summary] |
7a. New Courses Developed:
|
[Top] [Bottom] [Resume Summary] |
|
[Top] [Bottom] [Resume Summary] |
|
[Top] [Bottom] [Resume Summary] |
|
[Top] [Bottom] [Resume Summary] |
10b. Proceedings: (Refereed papers)
|
[Top] [Bottom] [Resume Summary] |
10c. Commissioned Publications:
10d. Journal Paper Discussion:
10e. Transaction Papers:
|
[Top] [Bottom] [Resume Summary] |
|
[Top] [Bottom] [Resume Summary] |
|
[Top] [Bottom] [Resume Summary] |
|
[Top] [Bottom] [Resume Summary] |
12e. Involvement in Graduate Research
a. Major Professor for Student Theses (completed)
| Year |
Student |
Thesis Title |
Degree |
| 1992 |
M. Hsie |
Statistical Quality Acceptance Methods for Highway Steel Bridge Painting |
M.S. |
| 1988 |
J.J. Orczyk |
Parametric Construction Scheduling |
Ph.D. |
| 1988 |
P.S. Garner |
An Investigation of Surface Coating on Exposed Concrete |
M.S. |
| 1993 |
A. Panzeter |
A Methodology for Modeling the Cost and Duration of Concrete Highway Bridges |
Ph.D. |
| 1994 |
M. Hsie |
Computer Aided Acceptance Planning |
Ph.D. |
| 1996 |
C. Wang |
Real Time In-Place Concrete Strength Evaluation |
M.S. |
| 1999 |
Y. Abdelrazig |
Construction Quality Assessment: A Hybrid Decision Support Model Using Image Processing and Neural Learning for Intelligent Defects Recognition |
Ph.D. |
| 2000 |
M. Georgy |
Utility-based Neurofuzzy Approach for Engineering Performance Assessment in Industrial Construction Projects |
Ph.D. |
| 2001 |
P. Chen |
Digital Image Recognition Methods for Infrastructure Surface Coating Assessment |
Ph.D. |
| 2002 |
Y. Lee |
Deterioration Modeling and Rehabilitation Decision Analysis for Assessing the Performance of Bridge Deck Expansion Joints |
Ph.D. |
| 2002 |
L. Zhang |
Engineering Performance Improvement Based on the Integration of Genetic Algorithms and Artificial Neural Networks |
Ph.D. |
b. Chairperson for Non-thesis Graduate Committee (completed)
|
Year |
Student |
Independent Study Title |
Degree |
|
1987 |
D. Klinstiver |
Issues and Findings Pertaining to Quality Assurance |
MSCE |
|
1987 |
W. Marshalla |
Identifications of Key Resources for Information on New Innovative Technologies |
MSCE |
|
1988 |
M. Najafi |
The Pitfalls of International Construction in the Middle East |
MSCE |
|
1988 |
S. Freimuth |
Construction Process Improvement: An Application and Critique of Methods |
MSCE |
|
1988 |
E. Rogriquez |
Linear Scheduling For Projects of Repetitive Nature |
MSCE |
|
1988 |
B. Dehnke |
Cost Savings Realized Through The Use of Project Agreements |
MSE |
|
1989 |
N. Sako |
Job Cost Control |
MSCE |
|
1989 |
M. Lukey |
Automated Building Technology Forecast and Evaluation System |
MSCE |
|
1989 |
A. Ismail |
Evaluation of Construction Productivity Manuals |
MSE |
|
1990 |
E. Herdinati |
Statistical Analysis of The Effect of Weather on Productivity |
MSE |
|
1990 |
L. Chao |
Local Area Network for Construction Project |
MSCE |
|
1991 |
L. Hung |
Telecommunication in Intelligent Building |
MSCE |
|
1992 |
S. Sinha |
Intelligent Buildings Telecommunications Networks and Cyclops |
MSCE |
|
1992 |
R. Yamershita |
The Concept of An Underground Intelligent City in Japan |
MSCE |
|
1992 |
D. DeVoe |
Electrical and Instrumentation Construction |
MSE |
|
1993 |
M. Cheng |
The Application of Voice Recognition in Bridge Painting Quality Control |
MSCE |
|
1993 |
Y. Kurematsu |
Investigation of Automated Construction |
MSE |
|
1993 |
Amr Mahmoud |
National and Construction Productivity in 1980's |
MSCE |
|
1995 |
H. Wu |
Interpretation of ISO 9000 from General Contractor's perspective |
MSCE |
|
1995 |
H. Ke |
Operating Characteristic Curves for Evaluating Quality Acceptance in Concrete |
MSCE |
|
1998 |
F. Chandra |
The Degree of Impact of Foreign Currency Risks on Build Operate Transfer (BOT) Projects |
MSCE |
|
1999 |
R. Weng |
XML Application in Construction |
MSCE |
|
1999 |
P. Chen |
Application of BOT Financial Model to Taiwan High Speed Rail Project |
MSCE |
|
2000 |
S. Youm |
A Comparative Analysis on the Design-Build Process |
MSCE |
|
2000 |
S. Lee |
Analytical Methods for Bid-markup Decisions in Microtunneling Projects |
MSCE |
c. Serving on Thesis Graduate Committee (completed)
| Year |
Student |
Research Area |
Degree |
| 1988 |
J. Russell |
A Knowledge Based System Approach to the Contractor Pre-qualification Process |
Ph.D. |
| 1989 |
A. Hijazi |
Construction Simulation |
Ph.D. |
| 1990 |
A. Singh |
Development of Process and Mix Flexibility in Construction |
Ph.D. |
| 1990 |
S. AbouRizk |
Input Modeling For Construction Simulation |
Ph.D. |
| 1990 |
J. Lutz |
Repetitive Construction Process Planning Using Simulation and Line of Balance |
Ph.D. |
| 1991 |
O. Salah |
Computerized Decision Supporter For Modularization of Industrial Construction |
MSCE |
| 1992 |
B. Nicholson |
A Framework for Planning Infrastructural Rehabilitation Strategies Using Multiple Objectives |
MSCE |
| 1993 |
C. Huang |
Generic System and Case Studies for Risk Management of Public Construction Project, at National Taiwan Institute of Technology. |
Ph.D. |
| 1993 |
L. Chao |
An Adaptive Approach to Evaluation of Implementation Prospects of New Construction Technologies. |
Ph.D. |
| 1993 |
B. Patty |
A Construction Engineering Platform for the Integration of Constructability Concepts. |
Ph.D. |
| 1994 |
R. Huang |
A Graphical-Based Method for Transient Evaluation of Construction Operations. |
Ph.D. |
| 1996 |
W. Yu |
A Neuro-Fuzzy Knowledge-Based Multi-Criterim Decision Model for Constructability Analysis and Improvement of Construction Technologies |
Ph.D. |
| 1996 |
T. Cheng |
Impact of Front-End Loading on Construction Project Cash Flow - A Mathematical Approach for Determination of Unit Prices in Bidding |
Ph.D. |
| 1996 |
K. Lueprasert |
Constructability Knowledge Acquisition - A Machine Learning Approach |
Ph.D. |
| 1997 |
J. Son |
Multi-Heuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach |
Ph.D. |
| 1999 |
R.Wirahadikusumah |
Optimization Modeling for Management of Large Combined Sewer Networks |
Ph.D. |
| 1999 |
A. Wang |
Performance of Segregated Hot Mix Asphalt Pavement |
Ph.D. |
| 2000 |
Y. Chang |
Statistical Models for MRF Image Restoration and Segmentation |
Ph.D. |
| 2001 |
L. Martinez |
A Neuro-Fuzzy Decision Support System for Risk Analysis of Revenue-Dependent Infrastructure Projects |
Ph.D. |
| 2001 |
T. Zayed |
Assessment of Productivity for Concrete Bored Pile Construction |
Ph.D. |
| 2003 |
S. Chou |
Assessment of Construction Smoothness Specification Pay Factor Limits by Artificial Neural Network Modeling |
Ph.D. |
|
[Top] [Bottom] [Resume Summary] |
13. 1991 University Administration and Committee Assignment:
14. Registration and Licenses:
15. Professional and Scientific Society Activities:
|
[Top] [Bottom] [Resume Summary] |
|
[Home] [Brief Vita] [Resume Summary] | |
|
Last revised: Monday, FEB-25-01 11:05:03 EST |
|