
|
|
|
1. Lawley, M. and
Black, JT., Design of a Self-Propelled
2. Albright, T., Ingram, R., and Lawley, M. “The Beville Manufacturing Case: Using Factory Simulation Software to Teach the Concept of Activity Based Costing and Nonfinancial Performance Measures" The Journal of Accounting Education, 10(2), 329-348, 1992. 3. Herman, A., Lawley, M., Lu, S., and Mattox, D. “An Opportunistic Approach to Process Planning within a Concurrent Engineering Environment", Annals of CIRP, 42(1); 545-548, 1993. 4. Lu, S., Smith,
K., Herman, A., Mattox, D., Silliman, M., Lucenti, M., Jacobs, J., Chazin, D.,
Lawley, M., and Case, M. “SWIFT:
System Workbench for Facilitating and Integrating Teams”, The International Journal of Intelligent
and Cooperative Information Systems, 3(2); 173-187, 1994. 5. Reveliotis, S., Lawley, M., Ferreira, P. “Polynomial Complexity Deadlock Avoidance Policies for Sequential Resource Allocation Systems” IEEE Transactions on Automatic Control, 42(10); 1344-1357, 1997. 6. Lawley, M., Reveliotis, S., Ferreira, P. “Structural Control of Flexible Manufacturing Systems and the Neighborhood Policy: Part 1 Correctness and Scalability” IIE Transactions, 29(10); 877-887, 1997. 7. Lawley, M., Reveliotis, S., Ferreira, P. “Structural Control of Flexible Manufacturing Systems and the Neighborhood Policy: Part 2 Generalization, Optimization, and Efficiency” IIE Transactions, 29(10); 888-899, 1997. 8. Lawley, M., Reveliotis, S., Ferreira, P. “Design Guidelines for Developing Deadlock Handling Strategies in Flexible Manufacturing Systems” International Journal of Flexible Manufacturing Systems, 9(1); 5-29, 1997. 9. Lawley, M., Reveliotis, S., Ferreira, P. “The Application and Evaluation of Banker’s Algorithm for Deadlock Free Buffer Space Allocation in Flexible Manufacturing Systems” International Journal of Flexible Manufacturing Systems, 10(1); 73-100, 1998. 10. Lawley, M., Reveliotis, S., Ferreira, P. “A Correct and Scalable Deadlock Avoidance Policy for Flexible Manufacturing Systems” IEEE Transactions on Robotics and Automation, 14(5); 796-810, 1998. 11. Lawley, M. “Deadlock Avoidance for Production Systems with Flexible Routing” IEEE Transactions on Robotics and Automation, 15(3), 497-510, 1999. 12. Lawley, M. and Mittenthal, J. “Order Release and Deadlock Avoidance Interactions in Counterflow System Optimization” International Journal of Production Research, 37(3), 3043-3062, 1999. 13. Lawley, M. “Integrating Routing Flexibility and Algebraic Deadlock Avoidance Policies in Automated Manufacturing Systems” International Journal of Production Research, 38(13); 2931-2950, 2000. 14. Lawley, M. and Reveliotis, S. “Optimal Deadlock Avoidance in Sequential Resource Allocation Systems: Hard and Easy Cases” International Journal of Flexible Manufacturing Systems, 13(4); 385-404, 2001. 15. Gebraeel, N. and Lawley, M. “Deadlock Detection, Prevention, and Avoidance for Automated Tool Sharing Systems in Flexible Manufacturing” IEEE Transactions on Robotics and Automation, 17(3); 342-356, 2001. 16. Sulistyono, W. and Lawley, M. “Deadlock Avoidance for Manufacturing Systems with Partially Ordered Process Plans” IEEE Transactions on Robotics and Automation, 17(6); 819-832, 2001. 17. Park, J., Reveliotis, S., Lawley, M. and Ferreira, P. “Correction to the RUN DAP for conjunctive RAS” IEEE Transactions on Automatic Control, 46(4), 672, 2001. 18. Mullinax, C. and Lawley, M. “Assigning Patients to Nurses in Neonatal Intensive Care” Journal of the Operational Research Society, 53(1), 25-35, 2002. 19. Lawley, M. and Sulistyono, W. “Robust Supervisory Control Policies for Manufacturing Systems with Unreliable Resources” IEEE Transactions on Robotics and Automation,, 18(3), 346-359, 2002. 20. Lawley, M. “Control of Deadlock and Blocking in Production Systems with Unreliable Workstations” International Journal of Production Research, 40(17), 4563-4582, 2002. 21.
Aytug, H., Barua, A., Lawley, M., and Uzsoy, R. “Observations on the
Interactions Among Deadlock Avoidance Policies and Dispatching Rules” International
Journal of Production Research, 31(1), 81-95, 2003.
22. Gebraeel, N., Lawley, M., Liu, R. and V. Parmeshwaran, “Residual Life Predictions from Vibration Based Degradation Signals: A Neural Net Approach,” IEEE Transactions on Industrial Electronics, 51(3), pp. 694-700, 2004. 23. Gebraeel, N., Lawley, M., Li, R. and Ryan, J.K., “Residual Life Distributions from Component Degradation Signals: A Bayesian Approach,” IIE Transactions, 37(6), 2005. 24. Aytug, H.*, Lawley, M.*, McKay, K.*, Mohan, S. and Uzsoy, R.*, “Executing Production Schedules in the Face of Uncertainties: A Review and Some Future Directions,” European Journal of Operational Research, 161, pp. 86-110, 2005. 25. Chew, S. and Lawley, M., “Robust Supervisory Control for Resource Allocation Systems with Multiple Resource Failures,” IEEE Transactions on Automation Science and Engineering, 3(3), 2006. 26. Jeong, H., Qiao, J., Abraham, D., Lawley, M., Richard, J. P. and Yih, Y., “Minimizing the Consequences of Intentional Attack on Water Infrastructure,” Computer-Aided Civil and Infrastructure Engineering, 79-92, 2006. 27. Gebraeel, N., Lawley, M., Wu, S. and Yih, Y., “A Neural-Network Integrated Decision Support System for Optimal Predictive Maintenance,” IEEE Transactions on Systems, Man, and Cybernetics, to appear January 2007. 28. Jeong, H., Qiao, J., Abraham, D., Lawley, M., Richard, J. P. and Yih, Y., “Optimal Allocation of Security Resources in Large Water Networks,” IIE Special Issue on Homeland Security, 38, 1-15, 2007. 29. Gebraeel, N. and Lawley, M, “An Adaptive Neural Network Degradation Model for Computing and Updating Residual Life Distributions,” IEEE Transactions on Automation Science and Engineering, accepted for publication. 1. Wang, S., Chew,
S., Lawley, M. “Using Shared Resource Capacity for
Robust Control of Failure Prone Manufacturing Systems” IEEE Transactions
on Systems, Man, and Cybernetics, third revision,
January 2006. 1. Baumann,
J., Lawley, M., Mishra, A., Ryan, J.K., Tew, J., Wu, P., “Evaluating the
Performance of Cross-docks: A Data Envelopment Analysis Approach” Annals of Operations Research,
submitted February 2006. 2. Chew, S., Lawley, M. “Robust Supervision for Product Types with Multiple Unreliable Resources” IEEE Transactions on Automation Science and Engineering, submitted March 2006. 3.
Muthuraman, K., Lawley, M “A
Probabilistic Overbooking Policy for Open Access Clinical Scheduling” IIE Transactions, submitted March 2006. 4. Delaurentis, P., Kopach, R., Lawley, M., Muthuraman, K., Ozsen, L., Qu, X., Rardin, R., Wan, H.*, Willis, D. “An Empirical Investigation of the Factors Affecting Open Access Outpatient Scheduling” Health Care Management Science, submitted June 2006. 5. Wang, S. , Chew, S., Lawley, M. “Implementation Guidelines for Robust Supervisors in Automated Manufacturing” International Journal of Production Research, submitted July 2006. 6. Turner,
J., Qiao, J., Lawley, M., Richard,
J.P., Abraham, D., “Configuring Damaged Water Infrastructure for Optimal
Distribution with Transportation Costs” Computers and Operations
Research, submitted August 2006. 7. Sankaranarayanan,
G., Sands, L., Yih, Y., Lawley, M., “Predicting
Patient No-show for Medical Appointments” Journal of General Internal Medicine, submitted
September 2006. 8. Lawley,
M.*, Doebbling, B., and Pekny, J. “Applying System Engineering Approaches to the Care of Complex
Patients” Journal of General
Internal Medicine, submitted October 2006. 9. Parmeshwaran, V., Turkcan, A.,
Lawley, M., Richard, J.P. “A Time-Space
Scheduling Model for Optimizing Recurring
Bulk Railcar Deliveries”, Transportation
Research, Part B, submitted September 2006. Refereed Journal Papers in Preparation 1. Spry, C., Lawley, M., Lin, F., Coyle-Rogers, P., Yih, Y. “Analysis of Equipment Requirements and
Staffing Patterns for Surgical Instrument Sterilization” Journal of
Hospital Infection, planned October 2006. 2. Muthuraman, K.*, Richard, J.P.,
Lawley, M.* “A Non-myopic Approach for Sequential Clinical
Scheduling with Overbooking” Operations
Research, planned November 2006. 3. Chakraborty,
S., Gebraeel, N. , Lawley,
M., Wan, H., “Residual Life
Estimation for Components with Non-symmetric Priors” IEEE
Transactions on Systems, Man, and Cybernetics, planned November 2006. 4. Wang, S., Chew, S., Lawley, M., “Condition-based Control for Manufacturing Systems with Unreliable Resources” IEEE Transactions on Automation Science and Engineering, planned December 2006. 5.
Chew, S., Lawley, M., and Reveliotis,
S. “Enumerating Process Completing Sequences for Resource Allocation Systems
with Process Synchronizations” IEEE Transactions on Automation Science and
Engineering, planned November 2006. 6.
Atyug, H., Lawley M., Upasani, A.,
Uzsoy, R. “Integrated Global Scheduling and Deadlock Avoidance for
Semi-conductor Manufacturing” IEEE Transactions on Automation Science and
Engineering, planned December 2006. 7.
Ren, K., Lawley, M., and Thomas, M.
“Warranty Planning Considering Customer Cost-Variability Sensitivity in
Preventive Maintenance” IEEE Transactions on Engineering Management, planned
November 2006. 8.
Ren, K., Lawley, M., and Thomas, M.
“Warranty Programs with Incentives for Cooperative Maintenance” IEEE
Transactions on Reliability, planned December 2006. Book Chapters 1.
Reveliotis, S., Lawley, M., and Ferreira, P. “Structural Control of Large-Scale Flexibly
Automated Manufacturing Systems.” Computer
Aided and Integrated Manufacturing Systems, Techniques and Applications,
Ed. Cornelius Leondes, Gordon and Breach Science Publishers, 2. Lawley, M. “Deadlock Analysis and Avoidance for Systems with Flexible Routing submitted for inclusion in Deadlock Resolution in Computer Integrated Systems, IEEE Press Ed. M. Zhou and M. Fanti. 3. Qiao, J., Jeong, J., Lawley, M. and Abraham, D., “Security Issues in Water Infrastructure,” to appear in Advances in Homeland Security, Vol. 1, The Science of Homeland Security, edited by S. Amass, A. Bhunia, A. Chaturvedi, D. Dolk, S. Peeta and M. Atallah. 4. Gebraeel, N., Lawley, M., Liu, R. “Vibration-based Condition Monitoring of Thrust Bearings for Maintenance Management,” appearing in Intelligent Engineering Systems Through Artificial Neural Networks: Volume 12, ASME Press, Ed Cihan H. Dagli, Anna L. Buczak, Joydeep Ghosh, Mark J. Embrechts, Okan Ersoy and Stephen W. Kercel, 2002 Conference Proceedings 1. Matson,
J.*, Webster, D., Dutt, R. and Lawley, M., “Evaluating and
Extending the Flexibility of a Cell Layout:
A Case Study,” Proceedings of
1990 International Industrial Engineering Conference, pp. 248-253, San
Francisco, CA, 1990. 2. Chaudhari,
S.*, Webster, D. and Lawley, M., “Phases of Robotic Cell Design
for DeBurring,” Proceedings of
International Conference of DeBurring and Surface Conditioning, Society
of Manufacturing Engineers, 1991. 3. Lu,
S., Smith, K.*, Herman, A., Mattox, D., Silliman, M., Lucenti, M.,
Jacobs, J., Chazin, D., Lawley, M. and Case, M., “SWIFT: System Workbench for
Facilitating and Integrating Teams,” Proceedings
of the Second Workshop on Enabling Technologies and Infrastructure for
Collaborative Enterprises, IEEE, pp. 48-59, Morgantown, WV, 1993. 4. Lawley,
M.* and Ferreira, P., “An Automaton Based Framework for Analysis
and Control of Flexible Manufacturing Systems,” Proceedings of 1994 Mid-America Conference on Intelligent Systems,
pp. 144-152, 5. Wallace,
J.*, Herman, A., Mowbray, D., Burnett, A. and Lawley, M., “A
Framework for Flight Vehicle Simulation,” Proceedings
of 1994 Object Oriented Simulation Conference, 26(2); pp. 176-182, 1994. 6. Reveliotis,
S.*, Lawley, M. and Ferreira, P., “Structural Control Policies for Flexible
Manufacturing Systems,” Proceedings of
11th International Conference on Computer Aided Production
Engineering, pp. 255-260, 7. Reveliotis,
S.*, Lawley, M. and Ferreira, P., “An Analytical Framework for Structural
Control of Flexible Manufacturing Systems,” Proceedings of 11th International Conference on Computer
Aided Production Engineering, pp. 249-254, 8. Reveliotis,
S.*, Lawley, M. and Ferreira, P., “Deadlock Avoidance Policies for
Large-Scale Flexibly Automated Manufacturing Systems,” Proceedings of 1996 Conference on Agile and Intelligent
Manufacturing Systems, 9. Lawley,
M.*, Reveliotis, S. and Ferreira, P., “Configurable and Scalable
Real Time Control Policies for Deadlock Avoidance in Flexible Manufacturing
Systems,” Proceedings of the Sixth
International Flexible Automation and Intelligent Manufacturing Conference,
pp. 758-768, 10. Ferreira,
P.*, Lawley, M., and Reveliotis, S, “Deadlock Avoidance Policies
for Resource Allocation Systems with Applications to FMS,” Proceedings of the 6th International
Conference on Emerging Technologies and Factory Automation, IEEE, Vol.1,
pp. 42-48, Kauai, HW, 1996. 11. Reveliotis,
S.*, Lawley, M.* and Ferreira, P., “On the Complexity
of Optimal Deadlock Avoidance in Flexible Manufacturing Systems,” Proceedings of 1997 International
Conference on Robotics and Automation, IEEE, Vol. 2, pp. 1008-1012, 12. Reveliotis,
S.* and Lawley, M.*, “Application of Banker’s Algorithm
for Deadlock Avoidance in FMS,”
Proceedings of the 6th International Conference on Emerging
Technologies and Factory Automation, IEEE, pp. 214-220, 13. Sahay,
R.*, Matson, J.*, Miller, D. and Lawley, M., “Single
Machine Scheduling with Sequence Dependent Setup Times and Setup Carry-Over,”
Proceedings of 1998 Industrial
Engineering Research Conference, 14. Lawley,
M., “Flexible Routing and Deadlock Avoidance in Automated Manufacturing
Systems,” Proceedings of 1998
International Conference on Robotics and Automation, IEEE, Vol. 1, pp.
591-596, 15. Lawley,
M., “Deadlock Characterization for Manufacturing Systems with Flexible
Routing,” Proceedings of 1998 Japan-USA
Symposium on Flexible Automation, pp. 1193-1196, 16. Lawley,
M., “Deadlock Avoidance for Manufacturing Systems with Flexible Routing and
Mixed Capacity,” Proceedings of 1998
International Conference on Systems, Man, and Cybernetics, IEEE, Vol. 1,
pp. 594-599, 17. Sulistyono, W.* and Lawley, M., “Deadlock
Avoidance for Manufacturing Systems with Partially Ordered Process Plans,” Proceedings of 2000 International
Conference on Robotics and Automation, IEEE, Vol. 4, pp. 3383-3388, San
Francisco, CA, 2000. 18. Sulistyono, W.* and Lawley, M., “Optimal
Deadlock Avoidance in Flexible Manufacturing Systems with Flexible
Sequencing,” Proceedings of 2000
Japan-USA Symposium on Flexible Automation, 2000JUSFA-13127, 19. Gebraeel, N.* and Lawley, M., “Deadlock
Characterization for Automated Tool Sharing Systems,” Proceedings of 2000 Japan-USA Symposium on Flexible Automation,
2000JUSFA-13152, 20. Roszkowska,
E.* and Lawley, M.*, “Supervisory Control for Flexible Assembly
Systems with AGV Material Handling,” Proceedings
of 6th International Conference on Methods and Models in
Automation and Robotics, Vol. 2, pp. 853-8, Technical University
Szczecin, Szczecin, Poland, 2000. 21. Aytug,
H.*, Lawley, M.*, Mohan, S. and Uzsoy, R.*,
“Executing Production Schedules in the Face of Uncertainties: A Brief Review
and Some Future Directions,” International
Conference on Industrial Engineering and Production Management Systems, 22. Sulistyono, W.* and Lawley, M., “Robust Supervisory Control Policies for
Manufacturing Systems with Unreliable Resources,” Proceedings of 2002 International Conference on Robotics and
Automation, IEEE, pp. 199-204, 23.
Gebraeel, N.* , Lawley, M.
and Liu, C. R., “Vibration Based Condition Monitoring of Thrust Bearings for
Maintenance Management,” ANNIE, in
association with IEEE Neural Network
Council, 24. Chew, S.*, Lawley, M. and Reveliotis, S., “Liveness Enforcing Supervision for
Resource Allocation Systems with Process Synchronizations,” 42nd
IEEE Conference on Decision and Control, December 2003. 25. Chew, S.*, Lawley, M. and Reveliotis, S., “Liveness Enforcing Supervision for Resource Allocation
Systems with Complex Workflows,” Proceedings of 9th International Conference on Methods and
Models in Automation and Robotics, 26. Gebraeel, N.*, Lawley M.
and Parmeshwaran V., "Bearing Life Percentile Prediction for Maintenance Management
and Replacement Decisions,” 13th
International Flexible Automation and Intelligent Manufacturing (FAIM)
Conference, June 2003. 27. Jeong,
H.S.*, Abraham, D. M., Qiao, J.*, Lawley, M., Richard, J. P. and Yih, Y., “Issues in Risk Management of Water
Networks against Intentional Attacks,” ASCE
International Pipeline Conference, 2004. 28. Qiao, J.*, Jeong, J., Lawley, M.,
Abraham, D., Richard, J. P. and Yih, Y., “A Consequence Mitigation Model for Water Networks Subject to
Intentional Physical Attacks,” ASCE
International Conference of Computing in Civil Engineering, Cancun, Mexico, July, 2005. 29. Chew, S.*
and Lawley, M., “Robust Supervisory Control for Resource Allocation Systems
with Multiple Unreliable Resources,” IEEE Conference on Automation Science and
Engineering, 30. Wang, S.,
Chew, S.* and Lawley, M.,
“Using Shared Resource Capacity for Robust Control of Failure Prone
Manufacturing Systems,” IEEE Conference on Automation Science and
Engineering, 31. Spry, C.* and Lawley, M.,
“Evaluating Hospital Pharmacy Staffing and Work Scheduling Using Simulation,”
Proceedings of the Winter Simulation
Conference, December 2005. 32. Lee., S.*, Locker, M.*,
Yih, Y., Lawley, M., Suelzer, C., Thayer, D and Doebbeling, B., “Dynamic Open
Access Scheduling for Outpatient Clinics:
A Simulation Study,” IERC,
Orlando, FL, 2006. 33. Sankaranarayanan,
G.*, Lee, S., Yih, Y., Lawley, M., Suelzer, C., Thayer, D. and
Doebbeling, B., “Patient No Show Prediction in Outpatient Clinics in Veterans
Administration,” IERC, Orlando, FL,
2006. 34. Qu, X.*, Rardin, R., Stuart, J.,
Tieman, L., Wan, H., Lawley, M., Willis, D and Rosenman, M., “A Statistical Model for the
Prediction of Patient Non-Attendance in a Primary Care Clinic,” IERC, Orlando, FL, 2006. 35. Qiao, J.*, Jeong, H., Richard, J.
P., Lawley, M., Abraham, D. and Yih, Y., “Consequences Mitigation Strategies for Water
Networks against Physical Destruction,” IERC, Orlando, FL, 2006. 36. Lawley, M.*,
Doebbling, B., and Pekny, J. “Applying
System Engineering Approaches to the Care of Complex Patients” Department of Veteran’s Affairs State of
the Art (SOTA) Conference, Washington D.C., September, 2006. |
![]()