Before & After
351 Overlook Dr.
West Lafayette


!> !>

Newest pictures:

2008

October 2009

Sept 2009

Jamestown 2009

June 2009, Mees tile samples

June 2009, Baby Shower for Grace

May 2009, need to download Inquisitive Cuisine Pics here

May 2009, need to download Lauren Pics here

April 2009, Anderson - Johnny and Jason

March 2009, kitchen & Anderson

Feb 2009, the kitchen destruction & Brian's baby

Jan 2009, at Pete and Janet's house

Christmas at Beloit 2008

Christmas at Anderson

December 2008: Pam's Cabinet & Brian's baby

2008, October: Dad visits

2008, Sept: our visit to Steve and Diane's house! Finally!

August 2008: Steve and Sara's pictures from vacation
June 2008: cleaning and Inquisitive Cuisine party
2008, May: walkway & mantle
2008, March/April: making a bookshelf and mantle
2008: Feb: making a bookshelf and mantle

2007

Graduation, Christmas 2007
Erin/JP shower and wedding
Sara's graduation and such
December 4, 2007
Steve paints the exterior 10/07
hallway 1/27/07
Christmas 2006 in Wisconsin

2006


5 of Brett's lightning pictures July 2006
Aug 19, 2006 - tree trimming
July 2006 - house, Erin/JP, Sara's Bday, screech owls, backyard
June 2006 - tearing down wallpaper and 2 weddings
May 2006 - trees are green
April 2006 - making the LR shelves6
Snow, Bathroom, shelves 3-26-06
Master Bathroom: March 2006, and Kitty
Master Bathroom: Feb 2006
2006 - bathroom, Sara's room, making the scrapbooks, the 5 Seniors
Master Bathroom: 2003 - 2006
Master Bathroom: Feb 2006

2005

Christmas 2005 - last pictures from my SLR
Bathroom tile & snow out the back
Thanksgiving & fireplace
Thanksgiving & fireplace
Black Granite fireplace & yard
10/29 grass, fireplace before, decorating the locker room
10/14/05
9/19/05
Fixing the old house & grass at new
Stacey's 50th Birthday
mostly the new carpet upstairs at Hamilton St.
Bathroom Design pictures
June 11 - 24, 2005...Di, GR, pancakes, M Bath
June 4, 2005
April 23 - May 14, 2005

garden design
around April 19th & new car
End of March 2005 - fireplace construction

March 19, 2005
March 3, 2005
January 22-29, 2005

2004

December 6th
After November 6th
November 6th
November 1st
October 2nd - 8th
September 19th? - new bathroom sinks
September 8th - the whole house

September 5th - new doors
August 21 - the Grandfather Clock
July 16th - Pete & Janet, plus the crew team moving furniture
July 5th & 6th - GR floor & birthday
July 3rd-5th weekend - slate floors & start of GR floor
June 19 (Inquisitive Cuisine) - June 26
June 13 slate floor in entry way
Around June 10 ? MB closet floor installed
Around June 1 ? Pictures of the Back!
Pictures from Andy's digital camera from May 23, 2004 -- mostly ceiling fans
May 19th - Andy took outside digital pictures
May 15 - pictures
May 4 - 9th
May 1-3 ... the flowers bloom & my car crunched
April 10 & 11 - Steve painted the Living Room and hallway
April 3, 2004 ... Steve staining the windows and putting up window trim in the Great Room.
March 28 - picked out ceiling fans for the Great Room.
March 25, 2004 ...craft room
March 14, 2004 ... guest bedroom floor & craft room molding done
March 10, 2004 ... craft room floor
March 07, 2004 ...flooring started!
February 29, 2004 ...Great Room ceiling finished!
February 14, 2004 ...Great Room in 4 pictures
February 7, 2004 ... took painting pictures

Jan 14th or so ... Steve staining the wood for the ceiling.
Pictures of Steve & his Dad not scanned in, yet, but here are 2 others.


2002

Pictures of the inside - BEFORE

Pictures of the our Trading Spaces fireplace inspiration!

Pictures of the happy new owners - us!

Pictures of the OUTSIDE from 11/9/02

More Pictures of the OUTSIDE from 11/9/02

Pictures of the view & kitchen from 11/18/02

ripping up carpet 11/20 - 22

Fireplace getting ripped up, and front 12/13, and more outdoor pictures

2003

Feb 2*, 2003: Before February 22nd

Feb 23, 2003: Snow! Trees! Morrocan room destruction...

Feb 24, 2003: 2 trees down ...

Mar6-7, 2003: more "before"...

March 14, 2003: the inside of the morrocan room is gone...

March 20, 2003: the room is gone to the cement!

April 1, 2003: tree stumps removed

April 2, 2003: footings poured, driveway concrete ripped up

April 5, 2003: Blocks set into concrete in the back, on top of the footers
April 20, 2003 ? Flowers in bloom!
May 1-5, 2003 ... our bedroom TRENCH The ultimate "you stay on your side of the bedroom" !
May 9, 2003 ... the inside of the laundry room is gone!
May 14 - 15... Tearing out the laundry floor. Pea gravel & filling dirt around the foundation done!
May 20-21? Steve ripped out the walls of the old bathroom and the utility room.
June 10? The garage is up! and Sara's closet is mudded
Dad visits June 21 -22, June 26 garage drywalled, June27 cement poured!

Concrete poured!June 27 -Party at Dave's!
Pete & Janet & Adam visit July 3-6: The garage bin closet gets finished, Sara's birthday
July 7 - the Great Room beam gets hoisted into place!

July 8 - 13 the Great Room roof work continues, craft room demolition

August 20th - the wall of windows is up!

Sept 9th or so

Sept 26th

Sept 26th

October 18th - basketball party

October 24th

October 26th

November 3rd Took a roll of pictures of the insulation 11/3/03 & 11/6, Sara's bath.
November 6th - Steve builds a Ramp
Driveway views & Drywall gets delivered - Monday Nov 17th
Tues. NOV. 18 - DRYWALL gets installed!
Wed. Dec 24 - Kurt Fischer finishes the drywall.
Our 2 Christmas trees, and Steve Painting.


Contractor: .....James Hicks 583-0459
.......................... Larry Hicks 743-9730

"After" ideas

The "wall of windows" in the back.


NORTH

The blue X shows the lot. There are 2-3 other houses past that, but it is on a dead end.
Erin (Sara's friend) lives at 321 Overlook!